combined 600 bhp water tube steam boilers

  • Offshore price : $20000-$100000 Get a quote on the right form
  • Minimum order quantity : 1 set :combined 600 bhp water tube steam boilers
  • Supply Capacity : 10 units/month :combined 600 bhp water tube steam boilers
  • Manufacturer/Brand : Fangkuai boiler
  • Port : Anyang
  • payment terms : Letter of Credit, Wire Transfer, VISA

Leave Your Message And Get Price!

I need the quotation of , the fuel is , this capacity is , use for . My Name is , my Email is , my WhatsApp is , Please Send the detail information for me!

Popular products

HOT

θrion Gas Fired Steam Boiler

Capacity:1-20t/h

Rated thermal efficiency: 100-104%

Fixed working pressure: ≤1.6MPa

Applicable fuel:natural gas etc.

consult
HOT

Gas(oil) Fired Integrated Hot Water Boiler

Capacity:0.7-14MW

Rated thermal efficiency:96-98%

Fixed working pressure:≤1.25MPa

Applicable fuel:Natural gas, light oil, etc.

consult
HOT

H6 Gas Fired Hot Water Boiler

Capacity:0.7-2.8Mw

Rated thermal efficiency: 97.2-106%

Fixed working pressure:0.1MPa

Applicable fuel:Natural gas, etc.

consult
HOT

T7 Vacuum Hot Water Boilerr

Capacity:2.8-7.0Mw

Rated thermal efficiency:≥105.5%

Fixed working pressure:-0.02MPa

Applicable fuel:Natural gas, etc.

consult
HOT

V6 Gas Fired Hot Water Boiler

Capacity:99Kw

Rated thermal efficiency:97.2-104.4%

Fixed working pressure:1.0MPa

Applicable fuel:Natural gas, etc.

consult
HOT

Electric Steam Boiler

Capacity:0.5-4.0 t/h

Rated thermal efficiency:98%

Fixed working pressure:≤1.25MPa

Applicable fuel:electric energy

consult

Leave us a message

We will send out plans and quotations within five minutes

Name (optional)

Email

Whatsapp

Choose product type

Message

Get display discount

Contact us

Global Sales Hotline:
0086-371-60922096

Email: [email protected]

Voicemail
  • MCQ in Power Plant Engineering Part 8 | ME Board Exam

    Dec 19, 2020 · 379. A water tube boiler has a capacity of 1000 kg/hr of steam. The factor of evaporation is 1.3, boiler rating is 200%, boiler efficiency is 65% and heating surface area is 0.91 m 2 per bo.Hp. and the heating value of fuel is 18,400 kCal/kg. The total coal available in the bunker is 50,000 kg. Determine the no. of hrs. to consume the available Get Price

  • Manuals Air Conditioners, Boiler Manuals, Furnace Manuals

    The American Boiler Manufacturers Association (ABMA) is the national, nonprofit trade association of commercial, institutional, industrial and electricity-generating boiler system manufacturing companies (> 400,000 Btuh heat input), dedicated to the advancement and growth of the boiler and combustion equipment industry.Get Price

  • Combustion Evaluation: Sources and Control Devices

    In commercial or industrial boiler installations, boilers are rated based on their square feet of heating surface. Packaged boilers today are commonly rated on the basis that 5 sq. ft. of heating surface will produce 1 boiler horsepower, or 33, 500 btu of useful heat, and some claim even less surface required per BHP.Get Price

  • Captain-class frigate - Wikipedia

    Two Foster Wheeler Express "D"-type water-tube boilers supplied steam to GE 13,500 shp (10,070 kW) steam turbines and generators (9,200 kW). Electric motors for 12,000 shp (8,900 kW) drove the two shafts, each fitted with a three-bladed propeller of solid manganese-bronze that was 8 ft 6 in (2.59 m) in diameter.Get Price

  • Combustion Evaluation: Sources and Control Devices

    In commercial or industrial boiler installations, boilers are rated based on their square feet of heating surface. Packaged boilers today are commonly rated on the basis that 5 sq. ft. of heating surface will produce 1 boiler horsepower, or 33, 500 btu of useful heat, and some claim even less surface required per BHP.Get Price

  • British Armed Forces & National Service

    Six Yarrow oil-fired water tube boilers supplied steam at 425 lb/psi and 725 degrees superheat. The main engines developed 30,000 shp on five boilers (leaving one in reserve) for a normal service speed of 21 knots.Get Price

  • Captain-class frigate - Wikipedia

    Two Foster Wheeler Express "D"-type water-tube boilers supplied steam to GE 13,500 shp (10,070 kW) steam turbines and generators (9,200 kW). Electric motors for 12,000 shp (8,900 kW) drove the two shafts, each fitted with a three-bladed propeller of solid manganese-bronze that was 8 ft 6 in (2.59 m) in diameter.Get Price

  • PIPE ALBORBOR RAINBOW BOOK (CP) | PDF | Heat | Heat Transfer

    B Water substance at 70 bar and 65 degC enters a boiler tube of constant inside diameter of 35mm. the water leaves the boiler tube at 50 bar and 700degK at velocity of 100m/s/ calculate the inlet volume flow (li/sec) A. 0.821 B. 1.261 C. 0.344 D. 1.609. D Steam leaves an industrial boiler at 827.4 Kpa and 171.6 deg. C.Get Price

  • Board Exam1 | PDF | Enthalpy | Pressure - Scribd

    A water tube boiler evaporated 5.05 kg of water per second from a feed water temperature of 104.44 °C to steam at 1241.1 kPa and quality of 0.97; weight of coal fuel per second 0.57 kg; higher heating value of coal as fired, 11,800 Btu/lb. Determine the rate of absorption in kJ/s, the boiler horsepower, and the efficiency of steam generating Get Price

  • Board Exam1 | PDF | Enthalpy | Pressure - Scribd

    A water tube boiler evaporated 5.05 kg of water per second from a feed water temperature of 104.44 °C to steam at 1241.1 kPa and quality of 0.97; weight of coal fuel per second 0.57 kg; higher heating value of coal as fired, 11,800 Btu/lb. Determine the rate of absorption in kJ/s, the boiler horsepower, and the efficiency of steam generating Get Price

  • British Armed Forces & National Service

    Six Yarrow oil-fired water tube boilers supplied steam at 425 lb/psi and 725 degrees superheat. The main engines developed 30,000 shp on five boilers (leaving one in reserve) for a normal service speed of 21 knots.Get Price

  • MCQ in Power Plant Engineering Part 8 | ME Board Exam

    Dec 19, 2020 · 379. A water tube boiler has a capacity of 1000 kg/hr of steam. The factor of evaporation is 1.3, boiler rating is 200%, boiler efficiency is 65% and heating surface area is 0.91 m 2 per bo.Hp. and the heating value of fuel is 18,400 kCal/kg. The total coal available in the bunker is 50,000 kg. Determine the no. of hrs. to consume the available Get Price

  • PIPE ALBORBOR RAINBOW BOOK (CP) | PDF | Heat | Heat Transfer

    B Water substance at 70 bar and 65 degC enters a boiler tube of constant inside diameter of 35mm. the water leaves the boiler tube at 50 bar and 700degK at velocity of 100m/s/ calculate the inlet volume flow (li/sec) A. 0.821 B. 1.261 C. 0.344 D. 1.609. D Steam leaves an industrial boiler at 827.4 Kpa and 171.6 deg. C.Get Price