combined 2 ton water tube hot water boiler

  • Offshore price : $20000-$100000 Get a quote on the right form
  • Minimum order quantity : 1 set :combined 2 ton water tube hot water boiler
  • Supply Capacity : 10 units/month :combined 2 ton water tube hot water boiler
  • Manufacturer/Brand : Fangkuai boiler
  • Port : Anyang
  • payment terms : Letter of Credit, Wire Transfer, VISA

Leave Your Message And Get Price!

I need the quotation of , the fuel is , this capacity is , use for . My Name is , my Email is , my WhatsApp is , Please Send the detail information for me!

Popular products

HOT

θrion Gas Fired Steam Boiler

Capacity:1-20t/h

Rated thermal efficiency: 100-104%

Fixed working pressure: ≤1.6MPa

Applicable fuel:natural gas etc.

consult
HOT

Gas(oil) Fired Integrated Hot Water Boiler

Capacity:0.7-14MW

Rated thermal efficiency:96-98%

Fixed working pressure:≤1.25MPa

Applicable fuel:Natural gas, light oil, etc.

consult
HOT

H6 Gas Fired Hot Water Boiler

Capacity:0.7-2.8Mw

Rated thermal efficiency: 97.2-106%

Fixed working pressure:0.1MPa

Applicable fuel:Natural gas, etc.

consult
HOT

T7 Vacuum Hot Water Boilerr

Capacity:2.8-7.0Mw

Rated thermal efficiency:≥105.5%

Fixed working pressure:-0.02MPa

Applicable fuel:Natural gas, etc.

consult
HOT

V6 Gas Fired Hot Water Boiler

Capacity:99Kw

Rated thermal efficiency:97.2-104.4%

Fixed working pressure:1.0MPa

Applicable fuel:Natural gas, etc.

consult
HOT

Electric Steam Boiler

Capacity:0.5-4.0 t/h

Rated thermal efficiency:98%

Fixed working pressure:≤1.25MPa

Applicable fuel:electric energy

consult

Leave us a message

We will send out plans and quotations within five minutes

Name (optional)

Email

Whatsapp

Choose product type

Message

Get display discount

Contact us

Global Sales Hotline:
0086-371-60922096

Email: [email protected]

Voicemail
  • Waste Heat Recovery Methods And Technologies - Chemical

    Jan 01, 2013 · The payback period for installation of an economizer or APH depends mainly on the fluegas flowrate, stack temperature, annual operating hours and the need for hot water. An economizer or APH for water-tube boilers is typically not attractive for units operating under 10 kg/cm 2 g or below 20 ton/h of steam production, nor any size boiler that Get Price

  • All Plumbing Terminology

    Nov 08, 2019 · Hot Water Return Piping – Hot water return piping is piping connecting the end of a run of plumbing fixtures and/or appliances back to a hot water source i.e. a water heater or boiler. Most times a hot water return line is installed with a recirculating pump to insure hot water is always recirculating through the hot water supply piping.Get Price

  • Waste Heat Recovery Methods And Technologies - Chemical

    Jan 01, 2013 · The payback period for installation of an economizer or APH depends mainly on the fluegas flowrate, stack temperature, annual operating hours and the need for hot water. An economizer or APH for water-tube boilers is typically not attractive for units operating under 10 kg/cm 2 g or below 20 ton/h of steam production, nor any size boiler that Get Price

  • Integrated Coal Gasification Combined Cycle (IGCC) Power

    Oxygen-blown coal gasification captures CO 2 from gas having a high CO 2 content of about 40% under pressure ranging from 2.5 megapascals to 3.0 megapascals (pre-operation CO 2 capture), so that the gas flow to be treated is lower than the CO 2 content to be captured (post-operation CO 2 capture) from the boiler exhaust gas.Get Price

  • Compre Special Project (PPE &IPE) | PDF | Boiler | Thermal

    2. At an average temperature of 100C, hot air flows through a 2.5 m long tube with an inside diameter of 50 mm. The temperature of the tube is C along its entire length. Convective film coefficient is 20.1 W/m2-K. Determine the connective heat transfer from air to the tube. a. 900 W. c. 624 W. b. 909 W. d. 632 W. Solution Q. h AT. Where: AGet Price

  • Integrated Coal Gasification Combined Cycle (IGCC) Power

    Oxygen-blown coal gasification captures CO 2 from gas having a high CO 2 content of about 40% under pressure ranging from 2.5 megapascals to 3.0 megapascals (pre-operation CO 2 capture), so that the gas flow to be treated is lower than the CO 2 content to be captured (post-operation CO 2 capture) from the boiler exhaust gas.Get Price

  • SWEP Exchange_Nr2_2021

    SWEP has launched a technology which reduces the electrical consumption with up to 15% in combined heat pump/chiller systems. to optimize heat transfer through generating more efficient and faster hot water replenishment of the storage tank. (180°F) boiler water for 37.7°C (100°F) temperature rise. • Tank sizes ranging from 662.4 Get Price

  • Living Off the Grid: How to Generate Your Own Electricity

    The hot water, cook stove and clothes dryer are propane the old steam boiler to run a generator and also produce hot water after it has charged your batteries, use the solar panels for the batteries, and use the DC current to Why bother having a wind and solar panel at a combined output of 2 KW when you could just buy another inverter Get Price

  • Lelit Mara X PL62X Heat Exchange Espresso Machine

    Mar 27, 2020 · Thermo-siphon double-cycle heat exchanger system – Keeps the brew group and the boiler always hot, at the right temperature range for making espresso. Polymer tubing connection – From the boiler to steam and hot water valves: alimentary polymer tubes resist limescale buildup. These tubes are able to withstand high pressure and high Get Price

  • All Plumbing Terminology

    Nov 08, 2019 · Hot Water Return Piping – Hot water return piping is piping connecting the end of a run of plumbing fixtures and/or appliances back to a hot water source i.e. a water heater or boiler. Most times a hot water return line is installed with a recirculating pump to insure hot water is always recirculating through the hot water supply piping.Get Price

  • Published AHRI Standards and Guides

    A hot water boiler designed to operate at or below a water pressure of 160 psig and a temperature of 250 °F; or A boiler that is designed to be capable of supplying either steam or hot water, and designed to operate under the conditions in Sections 2.1.1 and 2.1.2 of this scope.Get Price

  • Rancilio Silvia Pro » CoffeeGeek

    Jul 07, 2021 · The Silvia Pro does not use the steam boiler as a heat exchanger to pre-heat water for the small brew boiler. This innovation was pioneered in the La Marzocco GS/3 and is what allowed that machine to run on 110V household current – the steam boiler does most of the work (including heating up the brew water via a heat exchanger) and because of that, recovery time …Get Price

  • Lelit Mara X PL62X Heat Exchange Espresso Machine

    Mar 27, 2020 · Thermo-siphon double-cycle heat exchanger system – Keeps the brew group and the boiler always hot, at the right temperature range for making espresso. Polymer tubing connection – From the boiler to steam and hot water valves: alimentary polymer tubes resist limescale buildup. These tubes are able to withstand high pressure and high Get Price

  • Rancilio Silvia Pro » CoffeeGeek

    Jul 07, 2021 · The Silvia Pro does not use the steam boiler as a heat exchanger to pre-heat water for the small brew boiler. This innovation was pioneered in the La Marzocco GS/3 and is what allowed that machine to run on 110V household current – the steam boiler does most of the work (including heating up the brew water via a heat exchanger) and because of that, recovery time …Get Price

  • Utility systems - processdesign

    Feb 21, 2016 · It is then mixed with hot air and blown into the firebox of the boiler. Burning in suspension, the coal/air mixture provides the most complete combustion and maximum heat possible. Water turns to steam: Highly purified water, pumped through pipes inside the boiler, is turned into steam by the heat.Get Price

  • POSITIONS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

    018 1.5 ton 024 2 ton 030 2.5 ton Etc. MODEL CODE SIZE 001 First Size 002 Second Size 003 Third Size 004 Fourth Size UNIT OF EXAMPLE CAPACITY RECORD OF CODE None — 000 Heating Input MBtuh 050 Elec Output Nom KW 005 Oil Input MBtuh 105 Boiler Size MBtuh 037 Air 100 CFM 012 Humidifiers Lbs of Water/Hr 060 DESCRIPTION CODE 10-12th POSITION Get Price

  • Utility systems - processdesign

    Feb 21, 2016 · It is then mixed with hot air and blown into the firebox of the boiler. Burning in suspension, the coal/air mixture provides the most complete combustion and maximum heat possible. Water turns to steam: Highly purified water, pumped through pipes inside the boiler, is turned into steam by the heat.Get Price

  • POSITIONS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

    018 1.5 ton 024 2 ton 030 2.5 ton Etc. MODEL CODE SIZE 001 First Size 002 Second Size 003 Third Size 004 Fourth Size UNIT OF EXAMPLE CAPACITY RECORD OF CODE None — 000 Heating Input MBtuh 050 Elec Output Nom KW 005 Oil Input MBtuh 105 Boiler Size MBtuh 037 Air 100 CFM 012 Humidifiers Lbs of Water/Hr 060 DESCRIPTION CODE 10-12th POSITION Get Price