textile boiler setup space

  • Offshore price : $20000-$100000 Get a quote on the right form
  • Minimum order quantity : 1 set :textile boiler setup space
  • Supply Capacity : 10 units/month :textile boiler setup space
  • Manufacturer/Brand : Fangkuai boiler
  • Port : Anyang
  • payment terms : Letter of Credit, Wire Transfer, VISA

Leave Your Message And Get Price!

I need the quotation of , the fuel is , this capacity is , use for . My Name is , my Email is , my WhatsApp is , Please Send the detail information for me!

Popular products

HOT

θrion Gas Fired Steam Boiler

Capacity:1-20t/h

Rated thermal efficiency: 100-104%

Fixed working pressure: ≤1.6MPa

Applicable fuel:natural gas etc.

consult
HOT

Gas(oil) Fired Integrated Hot Water Boiler

Capacity:0.7-14MW

Rated thermal efficiency:96-98%

Fixed working pressure:≤1.25MPa

Applicable fuel:Natural gas, light oil, etc.

consult
HOT

H6 Gas Fired Hot Water Boiler

Capacity:0.7-2.8Mw

Rated thermal efficiency: 97.2-106%

Fixed working pressure:0.1MPa

Applicable fuel:Natural gas, etc.

consult
HOT

T7 Vacuum Hot Water Boilerr

Capacity:2.8-7.0Mw

Rated thermal efficiency:≥105.5%

Fixed working pressure:-0.02MPa

Applicable fuel:Natural gas, etc.

consult
HOT

V6 Gas Fired Hot Water Boiler

Capacity:99Kw

Rated thermal efficiency:97.2-104.4%

Fixed working pressure:1.0MPa

Applicable fuel:Natural gas, etc.

consult
HOT

Electric Steam Boiler

Capacity:0.5-4.0 t/h

Rated thermal efficiency:98%

Fixed working pressure:≤1.25MPa

Applicable fuel:electric energy

consult

Leave us a message

We will send out plans and quotations within five minutes

Name (optional)

Email

Whatsapp

Choose product type

Message

Get display discount

Contact us

Global Sales Hotline:
0086-371-60922096

Email: [email protected]

Voicemail
  • Water Handbook - Chemical Feed Systems | SUEZ

    Chelants should never be fed directly into a boiler. Stainless steel chemical lines would be required, and chloride or caustic stress corrosion could cause the chelant feed line to fail inside the boiler. Localized attack of boiler metal would then occur. Chelants should not be fed if the feedwater contains a significant level of oxygen.Get Price

  • Fingerhut

    Save space. If you want to maximize space in your home, consider a wall mount to place your TV on the wall for a sleek look that is also a practical space saver. Double boiler. It's a two-chamber setup, featuring a water boiler in the bottom half, providing indirect heat to foods in the top half. This is the ideal way to melt chocolate or Get Price

  • Planning and design of building services in multi Story

    Sep 05, 2017 · The boiler diagram below works by heating the central heating water and pumping it around to the diverter valve. This is then diverted from the central heating circuit to go into the water to the heat exchanger where it passes the heat from the central heating water to the cold water coming into the boiler. 29.Get Price

  • Storm Water Program: Alphabetic List of SIC Codes | State

    3443 Fabricated Plate Work (boiler Shops) 3069 Fabricated Rubber Products, not elsewhere classified 3441 Fabricated Structural Metal 2399 Fabricated Textile Products, not elsewhere classified 3523 Farm Machinery & Equipment 4221 Farm Product Warehousing & Storage 3965 Fasteners, Buttons, Needles, & PinsGet Price

  • NAICS to SIC Crosswalk Search Results | NAICS Association

    Textile Goods, Nec: 313210: Broadwoven Fabric Mills: 2211: Broadwoven Fabric Mills, Cotton: 313210: Broadwoven Fabric Mills: (boiler Shop) 332321: Metal Window and Door Manufacturing : 3442: Metal Doors, Sash, and Trim: Guided Missile and Space Vehicle Propulsion Unit and Propulsion Unit Parts Manufacturing : 3764: Space Propulsion Get Price

  • Water Handbook - Chemical Feed Systems | SUEZ

    Chelants should never be fed directly into a boiler. Stainless steel chemical lines would be required, and chloride or caustic stress corrosion could cause the chelant feed line to fail inside the boiler. Localized attack of boiler metal would then occur. Chelants should not be fed if the feedwater contains a significant level of oxygen.Get Price

  • Storm Water Program: Alphabetic List of SIC Codes | State

    3443 Fabricated Plate Work (boiler Shops) 3069 Fabricated Rubber Products, not elsewhere classified 3441 Fabricated Structural Metal 2399 Fabricated Textile Products, not elsewhere classified 3523 Farm Machinery & Equipment 4221 Farm Product Warehousing & Storage 3965 Fasteners, Buttons, Needles, & PinsGet Price

  • NAICS to SIC Crosswalk Search Results | NAICS Association

    Textile Goods, Nec: 313210: Broadwoven Fabric Mills: 2211: Broadwoven Fabric Mills, Cotton: 313210: Broadwoven Fabric Mills: (boiler Shop) 332321: Metal Window and Door Manufacturing : 3442: Metal Doors, Sash, and Trim: Guided Missile and Space Vehicle Propulsion Unit and Propulsion Unit Parts Manufacturing : 3764: Space Propulsion Get Price

  • Planning and design of building services in multi Story

    Sep 05, 2017 · The boiler diagram below works by heating the central heating water and pumping it around to the diverter valve. This is then diverted from the central heating circuit to go into the water to the heat exchanger where it passes the heat from the central heating water to the cold water coming into the boiler. 29.Get Price